Application of Full-rotation Complete Tube Technology in the Construction of Pile Foundation in Medium-coarse Sand Geology

NING Feng yuan

Article ID: 2589
Vol 2, Issue 2, 2022
DOI: https://doi.org/10.54517/vfc.v2i2.2589
VIEWS - 22 (Abstract)

Abstract

The full-rotation complete tube technology is to drive the flower tube and the steel casing to be fastened by connecting pins, drive the steel casing to rotate 360 degrees, and apply torque and vertical load to the steel casing in the hole, with the help of the steel casing pipe to cut and drill the boulder and medium-coarse sandstone layer with strong force, make full use of the role of the steel casing to protect the wall, and then use the auger and sand drill to grab the confined water and the soil in the steel casing, and then clear thelobstacles inside of the steel casing. Controlling the slump of concrete and the amount of concrete poured each time can more effectively control the construction quality, which has obvious effects on speeding up the construction progress and improving efficiency, and at the same time avoiding environmental pollution.


Keywords

Full-rotation; Complete tube; Technology; Medium-coarse sand geology; Pile foundation construction; Application.

Full Text:

PDF



References

1. GB 50007-2011, Code for Design of building foundation [S].

2. JGJ 4-80, Code for Design and Construction of cast-in-place pile Foundation for Industrial and Civil Buildings [S].

3. JGJ 94-2008, Technical Code for Building Pile Foundations [S].

4. JGJ 79-2012, Technical Code for Building Foundation Treatment [S].

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 NING Feng yuan

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.