Optimal Design and Application of Earthwork Excavation Scheme for Deep Foundation Pit: Taking the New Construction of the Entrance and Exit of the Underground Passage in the Central area of the Pudong Senlan Block as an Example

LI Ai hua

Article ID: 2583
Vol 2, Issue 2, 2022
DOI: https://doi.org/10.54517/vfc.v2i2.2583
VIEWS - 1746 (Abstract)

Download PDF

Abstract

In the process of building construction, the optimization of the construction scheme has always played a great role in saving construction costs, reducing construction risks and speeding up the construction progress. This paper studies the optimization of the implementation plan of the deep foundation pit earthwork excavation stagein the actual case, and analyzes the results of the optimization of the plan, so that the optimized new plan can accelerate the construction period and save money while ensuring the project quality and construction safety. The construction cost has played a significant role.


Keywords

Deep foundation pit; Earthwork excavation; Shortcomings of the old scheme; Scheme optimization; Senlan Shangdu.


References

1. DG/TJ08-61-2018,Technical standards for foundation pit engineering [S].

2. Huang Jianzhang. Optimization and on-site management of excavation plans for ultra deep foundation pits [J]. Construction, 2008 (5).

3. Wang Hongsheng. Optimization and Effect Analysis of Earthwork Excavation Route [J]. Industrial Architecture, 2013 (1).

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 LI Ai hua

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.