Influence and Safety Evaluation of Underground Structure Construction on Adjacent Existing Subway Section
Vol 2, Issue 2, 2022
VIEWS - 2570 (Abstract)
Download PDF
Abstract
In recent years, with the rapid development of subway and underground comprehensive pipe corridor, the problem of close connection between underground structure and existing subway section structure is often encountered in engineering construction. During construction, the newly built underground structure will disturb the stratum, easily cause the additional displacement deformation and internal force change of the existing tunnel structure, and then lead to safety accidents. Therefore, it is particularly important to analyze the influence and safety evaluation of the new construction on the existing subway structure. This paper takes the construction of new underground power pipe gallery close to the existing subway section as an engineering case. The influence of adjacent construction on the existing structure is analyzed by three-dimensional finite element method, and then the safety of the existing structure is evaluated through deformation prediction, internal force analysis and bearing capacity checking calculation, and some construction safety protection suggestions are put forward. It has a certain reference for similar proximity projects.
Keywords
References
1. Ding Wenjuan. Analysis of the impact of urban tunnel excavation on the operation of underground subway sections [J]. Northern Architecture, 2017, 02 (05).
2. Wang Xuyong. The impact of power tunnel construction on the structure of existing subway sections [J]. Tunnel/Underground Engineering, 2014, 4 (09): 9-12.
3. Shen Yixiu. Research on Impact Analysis and Evaluation Methods for Adjacent Tunnel Construction [D]. Wuhan: Wuhan University of Technology, 2014.
4. Zhang Zhiguo, Zhang Mengxi, Wang Weidong. A two-stage analysis method for the impact of foundation pit excavation on adjacent subway tunnels [J]. Geotechnical Mechanics, 2011, 32 (7).
5. Yu Jin, Xu Qionghe, Xing Weiwei, et al. Numerical simulation analysis of uplift displacement of subway tunnels under excavation engineering [J]. Geotechnical Mechanics, 2007, 28 (Supplement 1): 653- 657.
6. Wang Weidong, Wu Jiangbin, Weng Qiping. Numerical simulation of the impact of excavation and unloading of foundation pits on subway section tunnels [J]. Geotechnical Mechanics, 2004, 25 (Supplement 2): 251-255.
7. Wang Mengshu. General Theory of Shallow Burial and Underground Excavation Technology in Underground Engineering [M]. Hefei: Anhui Education Press, 2004.
8. Xia Mingyao, Zeng Jinlun. Handbook of Underground Engineering Design and Construction [M]. Beijing: China Construction Industry Press, 1999.
9. Xie Xiaodong, Li Zikun, Chen Ruihao, et al. Analysis of the impact of foundation pit excavation on adjacent buildings and existing subways [J]. Roadbed Engineering, 2020 (2): 175-179.
10. Wei Gang, Zhao Chengli Calculation method for additional loads caused by excavation of foundation pits near subway tunnels [J]. Journal of Rock Mechanics and Engineering, 2016, 35 (S1): 3408-3417.
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 WANG Xing, LI Ming jun
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
ISSN
2810-918X (Online)